iprnagaland[at]gmail[dot]com (0370) 2271492 (Office)

On November 15, 2023, officials from the Chumoukedima District Administration, in collaboration with NHIDCL (National Highways and Infrastructure Development Corporation Ltd.) officials, conducted a joint verification of the Dimapur bypass, Chumoukedima section, as part of the Dimapur-Kohima 4 lane package 1&2.

In anticipation of the upcoming Hornbill Festival, Deputy Commissioner of Chumoukedima, Abhinav Shivam (IAS), along with Thejavizo Nakhro (RO), conducted a joint inspection. They engaged in extensive discussions with the General Manager (P), Dmp-PMU, NHIDCL, Authority's' Engineer, and the EPC Contractor to ensure a pothole-free Dimapur-Kohima 4-lane road.

(Vihepu IA Niuland)