The Department of Power, Nagaland, has informed the public about the scheduled vegetation clearance along 132kV transmission lines under the Kohima Transmission Division.
In a communication, the Executive Engineer, Transmission Division, Kohima, requested the general public in the affected areas to extend cooperation and bear with the inconvenience during the shutdown period required for the vegetation clearance work.
(DPRO, Kohima)

